Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
4 Jul 8 '10 fra>eng bride de jonction connection/connecting flange pro closed no
- Jul 8 '10 fra>eng détection de bourrage clog detection pro closed ok
- Jul 8 '10 fra>eng sablé à blanc sanded to bare metal pro closed ok
- Jul 8 '10 fra>eng porte-étalon test flange pro closed ok
4 Jul 7 '10 fra>eng joint d’injection point of injection connection pro closed ok
4 Jul 6 '10 fra>eng traitement spécifique de désodorisation de l'air specific odor control/reduction treatment for air pro closed ok
4 Jul 5 '10 fra>eng pris(e) en glace blocked with ice pro closed ok
- Jul 5 '10 fra>eng Answer hidden by answerer pro closed ok
4 Jul 1 '10 fra>eng Surface cumulée de plancher gross area of the floor pro closed ok
- Jun 30 '10 fra>eng mise en service (d'un bâtiment) commissioning of a building pro closed no
4 Jun 30 '10 fra>eng le rejet se fera par infiltration subsurface infiltration pro closed no
4 Jun 28 '10 fra>eng retombée en plaque de platre sheetrock drop pro closed ok
- Jun 28 '10 fra>eng Answer hidden by answerer pro closed ok
- Jun 28 '10 fra>eng Answer hidden by answerer pro closed ok
4 Jun 27 '10 fra>eng suspentes nonius nonius hangers pro closed ok
4 Jun 19 '10 fra>eng contre-calque transparent blueprint pro closed ok
- Jun 19 '10 fra>eng Answer hidden by answerer pro closed ok
4 Jun 17 '10 eng>fra true grade un nivellement précis pro closed ok
4 Jun 16 '10 fra>eng retards partiels pendant l'execution des travaux partial delays during the execution of work pro closed no
- Jun 16 '10 fra>eng Answer hidden by answerer pro closed ok
- Jun 16 '10 fra>eng Answer hidden by answerer pro closed ok
- Jun 15 '10 fra>eng équipage mobile form traveller pro closed ok
2 Jun 13 '10 fra>eng dés de fondation foundation pads pro closed ok
- Jun 13 '10 fra>eng Answer hidden by answerer pro closed ok
- Jun 9 '10 fra>eng homme trafic (construction site) flagger pro closed no
- Jun 4 '10 eng>fra laminate cutter Guillotine de couvre-plancher laminé pro closed ok
4 Jun 4 '10 eng>fra engineered flooring plancher d'ingénierie pro closed ok
- May 28 '10 fra>eng imprégner à coeur water-resistant core-treated gypsum sheathing /gypsum with a water-resistant core pro closed no
- May 28 '10 fra>eng Answer hidden by answerer pro closed no
- May 17 '10 fra>eng raccordé au tout à l'égout not connected to the main sewer network / mains drainage pro just_closed no
- May 17 '10 fra>eng Answer hidden by answerer pro just_closed no
- May 15 '10 fra>eng Answer hidden by answerer pro closed ok
- May 15 '10 fra>eng Answer hidden by answerer pro closed ok
- May 11 '10 eng>fra Answer hidden by answerer pro closed ok
- May 11 '10 eng>fra Quadroon à motifs carrés / à panneaux pro open no
- Apr 27 '10 fra>eng agitation résiduelle residual disturbance pro closed ok
- Apr 24 '10 fra>eng Answer hidden by answerer pro closed no
- Apr 23 '10 fra>eng au droit des niches at the position of the recesses pro closed no
- Apr 21 '10 fra>eng VE workforce control/verification pro just_closed no
4 Apr 14 '10 fra>eng APA Highway preliminary design pro closed ok
- Mar 23 '10 fra>eng intérieur d’ilot central courtyard pro closed ok
- Mar 4 '10 fra>eng gaine de précontrainte prestressed jacket pro closed ok
- Mar 1 '10 fra>eng robinet avec raccord au nez hose union pro closed no
Asked | Open questions | Answered